RUM – Rail Unloading Machine



Click Here
for a video demonstration.


 
RUM – Rail Unloading Machine
 

  • Single or dual-sided unloading
  • Compatible with most rail trains (minor modification to tunnel car may be required)
  • Winch car not needed
  • Travels under own power between job locations
  • Set-up time less than 30 minutes
  • Unloads an average of 12-15 rails per hour
  • Significantly reduces railroad provided manpower allowing them to focus on other projects
  • Production rate able to be increased when used in conjunction with automated tiedown car

 

For Information Contact:
Tim Francis at (816) 244-5742
or Send Email